Overview of Functions

Earthwork Volume Calculation [Shortcut command : EVC]

Calculate the area of ​​the cross section view and calculate the earthwork quantity.

INFRA-DESIGN > Cross Section View > Earthwork Volume Calculation

Select Layout

Option to select Layout

  • Select Layout : Select the layout from which to calculate the earthwork quantity. The start point, end point, and length information below are automatically entered based on linear information.

Add Bridge and Tunnel Segment

This is an option to enter bridge and tunnel segments to be excluded from earthwork quantity calculation.

  • Name : Enter a name for the bridge or tunnel segment.

  • Start Point : Enter the start point of the bridge or tunnel segment to be excluded from earthwork quantity calculation.

  • End Point : Enter the end point of the bridge or tunnel segment to be excluded from earthwork quantity calculation.

  • Length : It is automatically calculated based on the entered start and end point information.

  • Additional Segment List : You can check the list of added bridge and tunnel segments in this table.

Setting

Additional setup options

  • Earth Work Conversion Factor : Cutting quantity requires a volume conversion factor because the volume in compacted state must be entered in the earthwork quantity table.

Export Results

Export Results

  • Create Earth Work Calculation : Export an Excel file consisting of [cover + earthwork volume summary table + earthwork volume detailed calculation information].

  • Create Earth Work Summary Table : Export the SUM of each item of earthwork volume detail properties.

 