개요

  • 수량산출 대상을 설정하는 기능입니다.

실행

Summary


  • This feature sets the target for quantity calculation.

How to Run


[Construction Mode]

  • Ribbon Menu > [Construction] Tab > [Quantity Table] Group > Generate

설명

Explanation


Set the Quantity Generate

설정수량 산출 대상을 설정합니다

Sets the target for quantity calculation.

  • [Select Quantity Table]
    수량산출서를 새롭게 생성하거나, 기존 생성한 수량산출서를 선택합니다Create a new Quantity Calculation Table or select an existing Quantity Calculation Table.

  • [Classification]
    수량산출서의 이름을 입력합니다Enter the name of the Quantity Calculation Table.

  • [Select Target]
    수량산출 대상을 설정합니다Select the target for quantity calculation.

    • All: 생성된 모든 객체를 수량산출의 대상으로 선택합니다Select all created objects as targets for quantity calculation.

    • By Structure: Structure 분류 체계에 따라 수량산출서를 생성합니다Create the Quantity Calculation Table based on the structure classification system.

    • Construction Period: 해당 대상Set the corresponding target (Structure 분류 체계) 및 특정 기간을 지정합니다Classification System) and the specific construction period.

    • User Defined: 사용자가 원하는 객체만을 선택하여 수량산출의 대상으로 선택합니다Select only the desired objects as targets for quantity calculation.

Expand
title상세 설명 Detailed Explanation (By Structure)
  • Structure Table

    • Check: Select the target for quantity calculation using the On/Off 설정으로 수량산출의 대상으로 선택합니다setting.

    • Level / Name: Structure 기능에서 정의한 설정이 나타납니다Displays the settings defined in the Structure feature.

    • Template: 해당 Level의 수량 산출 양식을 선택합니다Select the Quantity Calculation Template for that corresponding level.

Construction Task 기능에서 Event가 정의되어 있어야 해당 설정을 통해 수량을 산출할 수 있습니다
  • Set the date for the quantity calculation for a specific period of time. This can only be set for the ‘Construction Period'.

    • Off: Quantity is calculated without any time limit.

    • On: Desired period of time is set for quantity calculation.

Expand
title상세 설명 Detailed Explanation (Construction Period)
  • Date Setting: 해당 대상에 대해 특정 기간의 수량 산출을 위해 날짜를 지정합니다. ‘Construction Period'에만 설정 가능한 옵션입니다.

    • Off : 기간 제한없이 수량을 산출합니다.

    • On : 사용자가 원하는 기간(날짜)을 설정하여 수량을 산출합니다.

Info
Info

The event must be defined using the Construction Task feature before the quantity can be calculated using the corresponding settings.

Expand
title상세 설명 Detailed Explanation (User Defined)
  • Target Unit Option: 수량산출 대상의 선택 단위를 설정합니다Set the unit for the quantity calculation.

    • Construction Mode: Constructio Mode의 수량산출 단위로 선택됩니다Unit in the Construction Mode is selected for quantity calculation.

    • Base Mode: Base Mode의 수량산출 단위로 선택됩니다Unit in the Base Mode is selected for quantity calculation.

    • Library Mode: Library 단위로 선택됩니다Unit in the Library Mode is selected for quantity calculation.

Info

Construction Mode의 수량산출 선택 단위는 일반 모드의 선택 단위와 다릅니다Units used for quantity calculation in the Construction Mode are different from the units used in the Base Mode.

  • Concrete Member : 객체 단위 Object unit / Pouring Part 단위unit

  • Steel Member : 객체 단위Object unit

  • Rebar : Wire Body 단위 (Wire 단위로 선택되기 때문에 Coupler 수량을 산출할 수 없습니다unit (The wire body unit cannot be used to calculate the quantity of couplers.)

  • Stiffener : Stiffener 개별 단위Unit for individual stiffener

  • Tendon : Wire Body 단위unit

  • Bolt : Bolt Group 단위unit

  • Slope Solid : Soil Type 단위unit

  • [Select Template]
    수량 산출 양식을 새롭게 생성하거나, 기존 생성한 수량 산출 양식을 선택합니다.

참고자료
  • Create a new Quantity Calculation template or select an existing Quantity Calculation template.