Construction Task

Summary


  • Enter the start and end date in the Structure set in the Base Mode, and create an Event so that objects can be created or removed by the date for each Structure.

 

How to Run


  • [Construction Mode] Ribbon Menu > [Construction] Tab > [Costruction] Group > Manage

 

Explanation


Define ‘Create / Remove Event’

Set the date and define the event by Structure.

  • Create/remove event for an object based on Structure.

  • [Task]
    Display the Structure set in Base Mode. The start and end dates can be selected for each Structure.

    • Level: Hierarchy of Structure

    • Name: Structure name

    • Start Date: Start date

    • End Date: End date

  • [Event]
    The lowest Structure in the table is displayed.
    Set a specific date to create or remove a specific object.

    • Select Date: Select the event date to register. Only choose within the date range of the Structure.

    • Event Type: Select the event type to register.

    • Select Target: Select the object to register. Only objects with the selected Structure information can be selected.

    • Add: Add events.

    • Modify: Modify events.

    • Delete: Delete events.

 

Reference Materials


  • Link to Reference Materials