Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

개요

  • Base Mode에서 설정한 Structure에 시작일, 종료일을 입력하고, Structure 별로 객체를 날짜별로 Create 또는 Remove 될 수 있도록 Event를 생성합니다.

실행

Summary


  • Enter the start and end date in the Structure set in the Base Mode, and create an Event so that objects can be created or removed by the date for each Structure.

How to Run


  • [Construction Mode] Ribbon Menu > [Construction] Tab > [Costruction] Group > Manage

설명

Explanation

Create

Define ‘Create / Remove

Event 정의하기Structure 별 날짜를 설정하고 Event를 정의합니다

Event’

Set the date and define the event by Structure.

  • Structure 기반으로 객체의 생성 / 제거 Event를 설정합니다Create/remove event for an object based on Structure.

  • [Task]
    Base Mode에서 설정한 Structure가 표출됩니다. 각 Structure에 시작일, 종료일을 선택할 수 있습니다Display the Structure set in Base Mode. The start and end dates can be selected for each Structure.

    • Level: Structure의 계층 구조Hierarchy of Structure

    • Name: Structure의 이름Structure name

    • Start Date: 시작일Start date

    • End Date: 종료일End date

  • [Event]
    테이블의 Structure 중 최하위 Strcutre를 선택하면 표출됩니다.
    특정 객체를 특정 날짜에 Create 또는 Remove 되도록 설정합니다The lowest Structure in the table is displayed.
    Set a specific date to create or remove a specific object.

    • Select Date: 등록할 Event의 날짜를 선택합니다. 선택한 Structure 날짜 범위 내에서만 선택 가능합니다Select the event date to register. Only choose within the date range of the Structure.

    • Event Type: 등록할 Event의 종류를 선택합니다Select the event type to register.

    • Select Target: 등록할 객체를 선택합니다. 선택한 Structure를 정보로 갖는 객체만 선택 가능합니다Select the object to register. Only objects with the selected Structure information can be selected.

    • Add: Event가 추가됩니다Add events.

    • Modify: Event를 수정합니다Modify events.

    • Delete: Event를 삭제합니다Delete events.

참고자료

참고자료 링크

Reference Materials


  • Link to Reference Materials